Company Details

  • Zhangjiagang EBA Machinery and Equipment Co., Ltd

  •  [Jiangsu,China]
  • Business Type:Manufacturer , Trade Company
Inquiry Basket ( 0 )
Home > News > Linear filling machine operation steps
News

Linear filling machine operation steps

1. After the machine is installed, adjust the filling track and the bottle to the level (adjust the foot screw).
2. The liquid storage tank is filled with syrup.
3. All electrical switches are in the off position.
4. Insert the vials to be filled into the tool box (20 boxes for each machine attached box).
5. Turn on the external power supply. The power socket must be a three-pin socket and have a reliable grounding wire to prevent electric shock from hitting the casing.
6. Turn the machine power switch to ON, and the power indicator light is on, indicating that the power is on.
7. The filling frame is supported by the filling support plate. The purpose is to prevent the filling frame from going down during the adjustment filling, and placing the debugging liquid container under the filling head.
8. Point the hand to the positioning sleeve on the top of the filling head. The positioning sleeve should be able to move up and down flexibly. The filling needle is exposed or retracted without obstruction.
9. Turn the switch under the liquid storage tank to the open position so that the liquid can flow into the total metering pump.
10. Adjust the screws on the crank according to the total amount of filling each bottle. For example: 5ml per bottle, 6 bottles at a time, the total amount is: 5ml × 6 = 30ml, and the total metering pump output tube is released by the dispensing tank end.
11. Turn the knob of the filling speed control board to about 20 degrees, and then turn the switch on the filling speed control board to the open position. At this point, the total metering pump works, the liquid medicine flows out from the total metering historical significance output tube, the measuring cup is measured, and the crank screw is fine-tuned. Close the filling speed control board switch and reset the total metering pump output tube.
12. Turn the filling speed control board switch to the open position, and the total metering pump works. The liquid medicine enters the liquid separator through the output pump of the total metering pump. After the liquid separation, the liquid volume fine-tuner flows out from the needle tube, and the measuring cylinder measures the liquid volume. Carefully adjust the liquid volume trimmer. When the liquid flowing out of each filling head is the set amount, tighten the liquid amount fine-tuning nut, cover the filling head casing, and loosen the filling bracket support plate.
13. The bottle is first checked the track of the bottle to see if the box is smooth. After confirming that there are no other abnormalities, turn the bottle switch to ON, the bottle chain plate rotates, and the tool box moves to the filling track in sequence, and Enter the filling track. Push the bottle to push the tooling and move the bottle to the filling head (you don't need to take the debugging tank in this process). When the medicine bottle is pushed under the filling head, the lower positioning sleeve of the filling frame automatically finds the bottle opening, the needle is inserted into the bottle mouth, the liquid medicine flows out, and the needle slowly rises during filling, which can eliminate the foam. After filling, the filling bracket is up. The filling head also rises and leaves the bottle. Under the action of the pusher plate, the tool box is pushed out of the filling area and the next filling starts.
Share to:  
Communicate with Supplier?Supplier
Ivy Ms. Ivy
What can I do for you?
Contact Supplier